top of page
ATC Potable Water Supply
This project consisted of constructing 5,200 feet of 12" HDPE waterline from the flight-line area to the Air Traffic Control Tower, B3600. It also included installing a new 1000 gallon septic tank and 300 linear feet of new leach field along with installing a new pump and pressure tank in mechanical room.
This project required boring under the main flight line and two separate taxiways at Mountain Home Airforce Base. Work was performed on an active airfield with an active Air Traffic Control Tower.
"TCG successfully executed this project without disrupting the critical flying mission. The work was performed with precision and great attention to detail. I highly recommend this construction team for future government construction Projects"
SSgt Austin Breault -Contracting Officer
bottom of page